Energy transition in property ownership: how WEGs are now cleverly financing their green refurbishments
The energy transition does not stop at the front door. For homeowners' associations (WEGs), photovoltaics, heat pumps, insulation and charging infrastructure are not just ecological projects, but above all economic ones. Clever financing is crucial: if you skilfully combine subsidies, condominium loans, reserves and contracting, you can reduce the monthly burden - and increase the attractiveness of the property at the same time.
What counts as „green refurbishment“ in the WEG?
Green refurbishments are measures that sustainably reduce energy consumption or CO₂ emissions or make the building fit for the future. Typical projects:
- Heating modernisation (e.g. heat pump, hybrid solution, new hydraulics, hydraulic balancing)
- Building envelope (façade and roof insulation, window replacement, front doors)
- Photovoltaics with own electricity utilisation or tenant electricity model
- Charging infrastructure for e-mobility, load management capable
- Digital energy measurement and monitoring
The financing modules at a glance
Solid financing distributes costs fairly and makes optimum use of subsidies. These building blocks can be combined:
- Maintenance reserve: reduces credit requirements and interest costs.
- Special levyOne-off own funds; useful for smaller packages (e.g. charging points).
- WEG loanJoint loan with annuity instalment; repayment via the house rent.
- Development loans and grants (e.g. as part of the BEG via KfW; municipal programmes depending on location). Amounts and conditions vary; repayment grants are often linked to efficiency standards.
- Contracting/leaseThird-party provider finances heat generation or PV; the WEG pays a fixed fee. Advantage: low initial investment.
- Feed-in tariff/tenant electricityAdditional income from PV can contribute to the annuity.
Clever combinations: Three practical scenarios
1) Heat pump + insulation light (30 units)Invest € 420,000 (assumption). 120,000 € reserve, 250,000 € WEG loan, 50,000 € subsidies. At 4 % interest and 20 years approx. 1,515 € annuity/month. Energy savings on heating costs: approx. € 1,700 per month (assumption). Result: positive monthly difference, also increases the classification in the energy performance certificate.
2) PV system 120 kWp with tenant electricityInvest € 150,000. Lease model with €0 capex for the WEG, lease €1,050/month, electricity revenues for tenants more favourable than grid electricity, WEG receives fixed lease income (a matter for negotiation). Advantage: lean balance sheet, image boost, start without large special levies.
3) „Ready“ charging infrastructure“Backbone (load management, main cabling) € 60,000, individual charging points by users. Financing via special levy € 30,000 + WEG loan € 30,000: with 4 % and 10 years approx. € 304/month. Allocation via car park users possible via user fee.
This way you can check in 10 minutes whether a measure is worthwhile:
- Annuity = loan amount × annuity factor (guide value for 4 %/20 yrs: approx. 0.073)
- Monthly savings = current energy costs - expected energy costs
- If savings + subsidy/electricity income ≥ annuity → measure is cash flow-neutral or positive
- Don't forget additional benefits such as increased value and reduced maintenance
Steps to a decision: how to do it efficiently
- 1. inventoryEnergy and building appraisals, load profiles, life cycle costs.
- 2. variant calculationThree packages (Basic/Plus/Premium) with CAPEX, OPEX, CO₂ effect.
- 3. conveyor checkFederal/state/municipal programmes, clarify deadlines and eligibility to apply.
- 4. financing structureMix of reserve, loan, subsidy, contracting. Obtain advance approval.
- 5. draft resolutionClear figures, cash flow, risks, maintenance. Legally clean formulation.
- 6. tendering/awardingQualified suppliers, warranty, fixed price/index clauses.
- 7. implementation/monitoringConstruction management, acceptance, digital energy controlling.
- Consider investment costs only → Include operating costs and energy price risks.
- Miss funding deadlines → Submit funding application before concluding the contract; anchor timetable in the resolution.
- Utilising too little reserve → 10-30 % Own contribution significantly reduces interest rates.
- PV feed-in only → Check own consumption/tenant electricity, often more profitable.
- Unclear cost allocation → Decide on usage fees and distribution key in advance.
Legally clean: Special features in the WEG
Building alterations with energy-related aspects are regularly subject to a resolution; the distribution of costs is based on the agreed keys and legal requirements. Important is a Precise decision-making (scope of measures, financing, distribution, commissioning, deadlines) and the Documentation (expert opinions, offers, subsidy confirmations). Operator and liability issues must be clearly regulated for tenant electricity and charging infrastructure. Tip: Bring legal and technical experts together at an early stage - this saves time and addenda.
Increasing value: why speed pays off
On the market side, energy-efficient houses are favoured: better rentability, lower ancillary costs, more attractive energy performance certificate. Even a jump from class F to D (depending on the location) can increase the cash value of the property. Buyers and banks honour predictable energy costs. If you decide on a combined refurbishment package and financing now, you will secure tradesman capacities and avoid the risk of price increases.
We analyse funding opportunities, financing options and cash flow potential - compact, clear and ready to make decisions.
Contact us here
Conclusion: With a well thought-out combination of reserves, WEG loans, subsidies and, if necessary, contracting, green renovations become calculable for owners - and often financially advantageous even during ongoing operation. We would be happy to prepare your draft resolution including a comparison of options. For a well-founded initial assessment, please use our short line: Contact form.